Accreditation Center
Lighting control – 405 m2
Examination process automation – 6 rooms
Student registration – up to 30 people per
hour
Audio and video device management:
Cameras and microphones – 38
Servers– 3
Control panels – 6
4-Star Hotel
Control of lift shaft lighting intensity and color
Lighting control:
By schedule
By signal from the control room
Lift shaft height: 27 meters
Wall-mounted lights: 27 units
New Hotel with Training Classrooms
7 floors
Cable length: 27.7 km
Light fixtures: 1,134 units
Panels: 29 units
Automation:
Lighting
Ventilation
Supervision and Centralized Control (BMS)
Design Office (1100 m2)
Lighting automation
Light fixtures: 324 units
Motion detectors: 41 units
Light sensors: 17 units
HVAC: 12 units
Ventilation unit with heat recovery
(AHU with heat recovery)
Facade Clock (2.3m diameter)
Synchronization with an atomic time source
Musical chimes scheduled to play hourly
Remote status monitoring from the duty engineer’s station
Salt Room (28 m2)
Control of:
RGBW lighting
HVAC
Medical device – saline solution dispenser
High-End Restaurant (480 m2)
Lighting control in common areas
HVAC control
Airport
Control and supervision:
General ventilation system
Energy consumption monitoring system
SCADA system
Laboratory Chiesi
Configuration of the automatic air preparation system for a 460 m² area
VRF automation